Can I utilize the "event assignment" feature alongside the "table assignment feature"?
Updated Oct 11, 2024
Currently, you can have either Event Assignment or Table Assignment activated, but not both at the same time. If you want to utilize one and then switch to the other, you can. The data will be saved and visible in the Event Attendance grid, you just cannot have them both activated at the same time.

Was this article helpful?
